VA Marion Historic Gym Renovation

This project is currently ongoing, and involves a complete renovation of this historic structure in active daily use. Some improvements include:

  • Improving the thermal envelope of the structure
  • Upgrading window units for enhanced operation and thermal efficiency
  • Complete replacement of water heating system with new high efficiency gas fired system
  • Improved efficiency plumbing with new low flow water closets, urinals and faucets – all with automatic flush valves
  • Installation of new efficient Water Source Heat Pumps to replace old steam system
  • New lighting design with energy efficient lighting that exceeds the new energy codes.  This was accomplished by using LED lamp sources and a combination of occupancy sensors and daylight harvesting sensors to save on lighting energy costs
  • The emergency lighting system will be replaced with new lighting wall packs that will be connected to the electrical lighting system.  These battery powered units will include a self-diagnostic charging system that is self-contained in the unit, allowing the unit to last for a full 90 minutes of operation.

VA-marion-historic-gym