VA Durham: Parking Garage Expansion

Apogee Consulting Group was part of the design team selected to expand and renovate the VA’s third-floor floor parking garage to six floors and correct numerous deficiencies in the structure.

The project required extensive on-site assessment and analysis of the existing parking structure to identify deficiencies, design improvements, and determine the best way to vertically expand the structure.

Deficiencies included:

  • Inadequate garage lighting
  • Poor stormwater drainage
  • Deficiencies in the topping coat concrete
  • Improved parking access controls and gatehouse
  • New signage indicating available spaces