The project required extensive on-site assessment and analysis of the existing parking structure to identify deficiencies, design improvements, and determine the best way to vertically expand the structure.
Deficiencies included:
- Inadequate garage lighting
- Poor stormwater drainage
- Deficiencies in the topping coat concrete
- Improved parking access controls and gatehouse
- New signage indicating available spaces