The project is split into three phases, allowing for function operations throughout construction to completely overhaul the HVAC system.
The project scope includes, in part:
- Removal of abandoned systems and the induction units in the ceilings
- Replacement of entire first floor ceiling system
- Second and third floor ACT (ceiling tile) removal and replacement as required
- Enlargement of existing interior vertical shafts for larger ducts
- New structure installation to support larger floor openings
- New shaft enclosures
- Miscellaneous insulation work
- An added exterior door
- New miscellaneous architectural finishes
- Abatement
- Miscellaneous HVAC piping
- Steam piping
- Chilled water pumps
- Four-pipe FCUs
- New ERV units
- Split-system AC units
- New AHUs
- Johnson Controls Metasys system (integrated into existing system)
- Electrical work