VA Sheridan: IT Upgrades

The purpose of this project is to modernize IT closets and bring them into compliance with VA standards.

The project included:

  • Upgrading the HVAC, electrical and emergency power, bolt-down racks
  • Installing new conduits, wall penetrations, floor penetrations
  • Re-routing wires for all types of data system (HVAC for cooling and controls, fire controls, nurse call, overhead paging, coax cable, phone line both copper and VoIP, cat 5, cat 6, fiber, etc.)
  • All low, med and high voltage electrical components, electrical distribution panels
  • Moving or building walls and making other architectural/space changes as well as other mechanical, electrical and plumbing modifications as necessary to accommodate equipment and future needs
WordPress management provided by OptSus.com